Errata


Known Errata (from 1st printing)

  • page 48, At the formula "Cost of downtime during repair", "$10 minute" should be "$10/minute"
  • page 48, At the end of sentence "The total life of the bearings is (22,300 ...", there's a missing equal (=) sign just before "59,600 hours".
  • page 49, At the end of sentence "The total life of the bearings is (17,000 ...", there's a missing equal (=) sign just before "51,000 hours".
  • page 50, Figure 2.15, Bomb 3 data point falls outside of grap axis (1st reporter : David Soukup )
  • page 51, Table 2.26, X coordinate for Bomb 10 should have positive sign (1st reporter : David Soukup )
  • page 53, Typo. Delete a repeated, unnecessary word, as follows: "The resulting lead-time distribution of lead-time demand ..." should be "The resulting distribution of lead-time demand ..."
  • page 333, Last line of page, delete "to". That is, change "now we know that we would also to reject it ...", to "now we know that we would also reject it ..."
  • page 466, Last paragraph. Change "Many textbook experiment designs ..." to "Many textbook experimental designs ..." Change plural to singular. That is, change "To conform to this assumptions, ..." to "To conform to this assumption, ..."
  • page 580, Appendix (normal table), page 580: The top row (header row) has wrong values.
    0.00 0.01 0.02 0.03 0.04

    should be

    0.05 0.06 0.07 0.08 0.09